Search results

1 – 1 of 1
Article
Publication date: 1 December 1997

Jau Woie Chang, Yih Ping Luh and Shean Shyong Chiou

Integrates CAD/CAM, production control and process control in a case study involving manufacturing automation. The manufacturing firm is a distributed cellular system operating in…

1198

Abstract

Integrates CAD/CAM, production control and process control in a case study involving manufacturing automation. The manufacturing firm is a distributed cellular system operating in a produce‐to‐order environment. Combines a parametric CAD software with global variables and global relations to achieve a design automation. Results obtained from design automation are transmitted to update the design model and the associative manufacturing model. In addition, scheduling and control are also integrated in the system. Distinguishes three scheduling levels: static scheduling, rescheduling, and real‐time scheduling. For a distributed and effective reason, the distributed shifting bottleneck procedure (DSBP) is adopted as the static scheduler and rescheduler, and the LRPT (longest bottleneck processing time) despatching rule is adopted as the real time despatching rule. FInally, introduces the configuration of the system including the flexible manufacturing cell architecture and the input buffer device. Uses a PLC programming toll that follows the IEC 1131‐3 standard to implement cell controllers. The above implementation aims to easily and effectively execute the CIM system.

Details

Integrated Manufacturing Systems, vol. 8 no. 6
Type: Research Article
ISSN: 0957-6061

Keywords

1 – 1 of 1